Dracena Park
In 2004, PBF was a major contributor to the development of the Dracena Park play area, tot lot and landscaping. The pathways in upper Dracena Park were made safer by paving the pathways in 2010. A large historical renovation took place in 2013, with the funding of the new Storyteller Bridge and its dedication on Arbor Day. The original bridge connected Park Way and Dracena Avenue, but due to disrepair, the bridge was removed in the 1990s.